Below is a sample of Gateway Pacific Contractors, Inc's current and past projects.

Bay St. Reservoir Replacement-Ph. 3

Design-Build project to replace four bolted steel storage tanks with one 6MG prestressed concrete water storage tank, associated piping and significant foundation mitigation inside and existing concrete basin.

Construction workers beside a large concrete wall and yellow formwork at a building site

Micromidas Pilot Plant

This $3.5M pilot plant located in W. Sacramento, CA transforms corrugated cardboard into paraxylene, a chemical used to make plastic bottles.

Factory workers in white coats moving wrapped goods beside industrial machinery and conveyor equipment.

Chico Digester Cover Replacement

We replaced a floating digester cover, digester gas piping and waste gas flare for City of Chico WPCP.

Crane lifting a large concrete ring onto a circular structure at a construction site

Banner Taylor

Nevada Irrigation District, Grass Valley, CA Replace a hypalon lined and covered earthen reservoir with two prestressed concrete potable water storage tanks (10.5MG)

Two large white storage tanks under construction in a forested clearing, surrounded by trees.

Recycled Water System Expansion

City of San Clemente, CA Modification and construction of various treatment facilities including tertiary filters, chlorine contact basins, chemical building/storage, effluent pump station, electrical/controls/SCADA and related support facilities.

Industrial water treatment facility with tanks, pipes, and equipment outdoors in a dry landscape.

Bay St. Reservoir Replacement-Ph 2

City of Santa Cruz, CA A 6MG prestressed concrete potable water storage tank, associated pump station, supply piping and significant foundation mitigation constructed inside an existing concrete-lined reservoir basin.

Aerial view of an industrial site with four white storage tanks and a large circular concrete structure.

Napa Recycled Water Expansion

Napa Sanitation District, Napa, CA Modification of existing and construction of new facilities, including DAF, chlorine contact basin, equalization basins, filters, pump station and chemical facilities.

Night construction site with large cranes pouring concrete at a bridge foundation in smoky dusk light

EAGLE PASS BRIDGE REPAIR

Precast concrete bridge for Border Patrol use.

Aerial view of a bridge over a canal with construction equipment and riprap embankments.

PRIMARY AREA IMPROVEMENTS PROJECT

Replacement of influent screening equipment and screening handling equipment for Encina Wastewater Authority.

Workers in hard hats inspecting industrial machinery with pipes and scaffolding in a plant

RESERVOIR 4605-1 CONSTRUCTION (SKY MOUNTAIN PRESSURE ZONE)

Construct 10MG prestressed concrete potable water storage reservoir.

Aerial view of a large circular industrial tank in a sandy desert site with access roads.

GRAY LODGE WILDLIFE AREA WATER SUPPLY

Widen 5 miles of existing canal including numerous check structures and road crossings to increase water supply for Gray Lodge Wildlife Area.